Traffic Impact Analysis

O’Rourke Engineering & Planning is the expert in traffic studies throughout Florida.

Each client’s project is treated with an emphasis on the outcome of the analysis whether the project is 2,000 square feet or 2,000 dwelling units.

Representative Projects

Project: The Avenir Development
Client: Avenir Holdings, LLC
Location: Palm Beach Gardens, Palm Beach County, FL

O’Rourke Engineering and Planning was retained as a successor engineer to complete the traffic analyses to support the Comprehensive Land Use Plan Amendment through Palm Beach Gardens and the complex Transportation Performance Standards (TPS) analysis for the 4,700-acre mixed use project. The firm ultimately identified the improvements required of the project and calculated the proportionate share costs and timing. We are analyzing site plans as the project moves into construction.

Project: Pinecrest
Client: Jerry Wuhrman
Location: Ft. Pierce, St. Lucie County, FL

O’Rourke Engineering & Planning was hired to prepare a traffic analysis for a proposed ninety unit assisted living facility to be located south of Weatherbee Road, east of US 1 in Fort Pierce. The project site required an access via its northern boundary to connect with Weatherbee Road. The purpose of our report was to determine the project’s direct impact on the surrounding roadway system and its compliance with all concurrency requirements.

Project: ALTON FKA Scripps Florida Phase II/Briger Tract
Client: The Lester Family Investments (now Kolter Homes)
Location: Palm Beach County, FL

O’Rourke Engineering & Planning prepared the traffic analysis and proportionate share details for the transportation analysis to address concurrency, land use, and Question 21 for the Scripps/Briger DRI. This DRI consisted of a mix of over 2,700 residential units and 4,500,000 square feet of non-residential development uses to include the future site of Scripps Florida expansion. Four phases of development were analyzed. The firm coordinated methodology and mitigation with affected parties including; Palm Beach Gardens, Town of Jupiter, FDOT, Palm Beach County, TCRPC, and Florida’s Turnpike Enterprise. Detailed trip generation assignment, access analysis, and operational analysis were conducted for each phase. Roadway needs, concepts, and costs were developed for all improvements. Ultimately, a detailed proportionate share agreement was developed as mitigation.

Other Projects

  • Pineland Prairie – Martin County, FL
  • Heritage Pointe – West Melbourne, FL
  • Village Royale – Palm Beach County, FL
  • Portofino – Indian River County, FL
  • Medical Office Center – Hallandale, Broward County, FL

Contact Us Today

 

O'Rourke Engineering
& Planning

3725 SE Ocean Blvd, Suite 201
Stuart, FL 34996

230 E Monument Ave.
Suite A4
Kissimmee, FL  34741